一区二区三区亚洲_国产视频不卡_欧美精品在线免费观看_欧美在线视频不卡_欧美日韩一区二区不卡_亚洲综合影视

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website: www.gsysconcepts.com

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
主站蜘蛛池模板: 国产成人精品免费视频大全办公室| 99精品久久| 亚洲第一页中文字幕| 日韩欧美大片| 国产精品一区二| 国产91一区| 日韩高清在线播放| 欧美黄色一区| aaa国产精品| 在线男人天堂| 亚洲在线视频| 欧美一区1区三区3区公司| 国产在线网| 日韩国产精品久久久久久亚洲| 在线免费av观看| 亚洲21p| 日韩精品一区在线| 在线不卡一区| 国产日韩精品一区| 99国产在线视频| 欧美福利在线观看| www.男人的天堂.com | 亚洲高清视频在线| 欧美三级在线播放| 男人久久久| 亚洲高清在线| 亚洲日本免费| 亚洲精品免费在线观看| 欧美专区视频| 一级毛片免费观看| 亚洲第一av网| 日韩欧美视频| 成人av国产| 伊人tv| 人人插人人| 日韩精品一级| 久久久久久97| 精品国产凹凸成av人导航| 裸交毛片| 久久久噜噜噜| 精品欧美一区二区三区久久久|